SRA Expertise
SRA Services & Expertise
Everything you need to know about the SRA redevelopment process — and how 7 Horses guides your society through every step.
Understanding SRA
What is SRA Redevelopment?
The Slum Rehabilitation Authority (SRA) scheme is a Maharashtra government initiative that enables the redevelopment of slum land in Mumbai. Under the scheme, eligible slum dwellers receive a free, modern home in exchange for their existing structure — funded by the developer through the sale of free-sale apartments on the same plot. When done right, SRA redevelopment is one of the most powerful tools for urban transformation — giving families a permanent, legal home at no cost to them.
Our Services
End-to-End SRA Redevelopment
Eligibility Assessment
We conduct a thorough, no-cost assessment of your society's eligibility under the SRA scheme. This includes reviewing land records, occupancy proofs, photo passes, and the current status of your plot under the Development Plan.
- Land record and DP zone verification
- Occupancy and photo pass review
- Consent feasibility analysis
- Free assessment — no obligation
Society Formation & Consent
A valid cooperative housing society and a minimum 70% member consent are mandatory under SRA guidelines. Our team assists with society registration, member documentation, and the consent process — ensuring everything is legally watertight.
- Cooperative housing society registration
- Member documentation and verification
- 70% consent drive and management
- Biometric consent as per SRA norms
SRA Authority Approvals
Navigating the SRA authority, BMC, and other government bodies is where most projects stall. Our in-house liaison team manages every approval — from the Letter of Intent to the Commencement Certificate — keeping your project on schedule.
- Letter of Intent (LOI) application
- Architect and structural plan approvals
- BMC and SRA NOC management
- Commencement Certificate procurement
Transit Camp & Rehabilitation
During construction, displaced residents need safe, dignified temporary accommodation. We arrange and manage transit camps — ensuring families are comfortable and informed throughout the construction period.
- Transit camp arrangement and management
- Monthly transit rent as per SRA norms
- Regular construction updates to residents
- Dedicated resident relationship manager
Construction & Quality
Our in-house construction team builds to the highest standards — using quality materials, certified contractors, and rigorous quality checks at every stage. Every building is structurally certified and earthquake-resistant.
- In-house project management team
- Certified structural engineers
- Regular third-party quality audits
- Earthquake-resistant RCC construction
Possession & Handover
We hand over your new home with all legal documents in place — Occupation Certificate, property card, and society formation. Your family moves in debt-free, with full legal ownership of their new home.
- Occupation Certificate from BMC
- Property card and legal documentation
- Society formation and handover
- Post-possession support and maintenance
Project Timeline
Typical SRA Project Timeline
Every project is different, but here is a general guide to what you can expect.
Phase 1
Assessment & Consent
3–6 Months
Eligibility check, society formation, and 70% consent drive.
Phase 2
Approvals
6–12 Months
SRA authority approvals, architect plans, LOI, and Commencement Certificate.
Phase 3
Construction
24–36 Months
Full construction of rehabilitation and free-sale buildings.
Phase 4
Possession
1–3 Months
OC, documentation, and handover of new homes to all residents.
Common Questions
Frequently Asked Questions
Ready to Explore SRA Redevelopment?
Get a free eligibility assessment for your society. Our experts will walk you through the process — no jargon, no pressure, no obligation.